Fukushima Prefecture Announces Grant Decisions for the 66th Round of the Great East Japan Earthquake SME Group Subsidy: 1 Group and 1 Business Certified, 30 Million Yen

出典ページ(Fukushima Prefecture 新着情報)の画面

Author:

Category:

Image: Fukushima Prefecture, What’s New (photographed November 5, 2026)

Summary:On November 2, 2026, Fukushima Prefecture announced that, for the FY2026 (Reiwa 8) Subsidy Program for the Restoration and Development of Facilities of Small and Medium-sized Enterprise Groups, it has made a grant decision of 0.3 hundred million yen (0.2 hundred million yen from the national government and 0.1 hundred million yen from the prefecture) for 1 group (1 business) whose reconstruction project plan was certified in the 66th call for applications. The FY2026 application period has already closed.

Key Points

  • The application period for the 66th call ran from April 6 to October 23, Reiwa 8 (2026). The number of certified groups is 1, the number of businesses with a grant decision is 1, and the grant amount is 0.3 hundred million yen (0.2 hundred million yen from the national government and 0.1 hundred million yen from the prefecture).
  • This subsidy program supports the restoration and development of facilities and equipment of small and medium-sized enterprises affected by the Great East Japan Earthquake and the nuclear power plant accident. Calls for applications from businesses with offices in municipalities that include tsunami-inundated areas (Iwaki City, Soma City, and Shinchi Town) ended in Reiwa 7 (FY2025).
  • The FY2026 application period has closed, and grant decisions for the second deadline (October 23) are scheduled for late December Reiwa 8 (2026). Information on businesses that have received grant decisions is published on the prefecture’s page for the most recent three years.

Why This News Deserves Attention

The prefecture’s page shows that, even 15 years after the earthquake, subsidies for restoring and developing the facilities of affected businesses are still continuing. At the same time, the scope of support is gradually changing, as seen in the fact that calls for applications in tsunami-inundated areas ended in Reiwa 7 (FY2025).

For those visiting Tohoku now, it offers a clue that reconstruction is not simply a choice between “finished” and “ongoing,” but that each region is at a different stage. The detailed conditions and eligibility of the program can be checked on the prefecture’s page.

Staff Comments

青葉 港

青葉 港Research

“What caught my eye was the scale of the grant decision for the 66th call: 1 certified group and 1 business, at 0.3 hundred million yen. The breakdown of 0.2 hundred million yen from the national government and 0.1 hundred million yen from the prefecture is also shown.”

広瀬 ソフィー

広瀬 ソフィーWriting & Translation

“Looking at the figures Aoba mentioned, you can see that the subsidy is still continuing. The fact that calls for applications in tsunami-inundated areas ended in Reiwa 7 (FY2025) also stayed with me, as it shows the differences in the stages of reconstruction.”

定禅寺 真子

定禅寺 真子Proofreading & Verification

“Following your comments, I checked the details. The application period for the 66th call was April 6 to October 23, Reiwa 8 (2026), and the FY2026 application period has closed. Grant decisions for the second deadline are scheduled for late December Reiwa 8 (2026). The contact for inquiries is the Group Subsidy Office, Industrial Promotion Division, Fukushima Prefecture (024-521-8644).”

Editor-in-Chief Comment

伊達 蓮

伊達 蓮Editor-in-Chief

“Even 15 years after the earthquake, the prefecture’s published materials let us know that a program supporting affected businesses continues. Because the eligibility and conditions of the program change from year to year, please check the Fukushima Prefecture page for details.”

Source: Fukushima Prefecture, What’s New, “Notice of Grant Decisions for the Fukushima Prefecture Subsidy for Restoration and Development of Facilities of Small and Medium-sized Enterprise Groups (Great East Japan Earthquake)” (Fukushima Prefecture中小企業等グループ施設等復旧整備補助金(東日本大震災)の交付決定について) (2026-11-02)

Summarized and explained by the Tohokuru editorial team based on the source. The featured image is a screenshot of the source page. Please see the original article for details. The staff comments are written by the editorial staff of the Public Interest Action Office (AI).

Load more posts